HDFC Bank Inaugurates Tech & Digital Factory in India’s Guwahati

Guwahati, Feb 24, KNT: HDFC Bank inaugurated its new Tech and Digital Factory in Guwahati, marking its first such facility in Assam and the fourth in the country after Mumbai, Bengaluru and Gurugram.
The facility was inaugurated by Chief Minister Assam, Himanta Biswa Sarma in the presence of senior bank officials and dignitaries from the Government of Assam. The centre will function as a hub for advanced technology development, innovation and talent incubation, aimed at strengthening artificial intelligence, digital and cybersecurity capabilities.
Bank officials said the factory will focus on core technology advancement across AI, cloud, data and engineering tracks, while enabling digital product creation in the state. It is also expected to generate employment opportunities for skilled professionals in Assam by leveraging local technology talent.
The initiative is part of the bank’s collaboration with the Government of Assam under Advantage Assam 2.0. Under this programme, the bank and the state government are jointly working to enhance academic knowledge with industry expertise through a structured skill-building curriculum in the BFSI and fintech sectors.
The programme, which began in September 2025, currently has over 150 students undergoing training. Participants will receive industry exposure and mentorship from senior executives of the bank. Students will also undertake internships of two to four months, enabling them to apply academic and technological concepts in real-world corporate settings. The course is being offered without any additional cost to students.
Commenting on the development, Deputy Managing Director Kaizad Bharucha said the facility would support digital product rollouts and attract engineering talent from Assam to contribute to next-generation banking technologies.
HDFC Bank began operations in Assam in 2004 with its first branch in Guwahati. As of December 31, 2025, it operates 138 branches and 248 ATMs in the state. According to the State Level Bankers’ Committee report, the bank’s credit-deposit ratio in Assam stood at 85.78 percent as of the same date. [KNT]
© Kashmir News Trust (KNT). Unauthorized use without attribution is prohibited.
![PCC Asks DC Pulwama to Shut Down Illegal Brick Kilns, 18 Brick Kilns Face Regulatory Violations, 7 Listed Without Consent Pulwama, Aug 8, KNT: Pollution Control Committee has asked Deputy Commissioner to shut down illegal brick kilns in South Kashmir's Pulwama district. The latest status of brick kilns operating in south Kashmir's Pulwama district has revealed serious regulatory concerns, with 18 units listed either without consent, with expired Consent to Operate (CTO), or under a “Refused” status. The status details show that seven brick kilns are listed as operating “Without consent”, indicating that the units do not have the required regulatory consent to operate. The seven units are Dar Brick Kiln (415) at Alliepora Shahoora, LBK changed into Bhat Brick Kiln (151) at Nownagri Pulwama, Kamran Brick Kiln 777 at Parigam Newa, Budshah Brick Kiln at Audoora Pulwama, JKB Sanzan (151) at Astapora Sanzan, 417 Brick Kiln changed into 7HH at Achan Litter Pulwama, and Five Star Brick Kiln at Wahipora Pulwama. The list further shows eight brick kilns with expired CTOs, meaning their consent to operate has lapsed. These include Hilal Brick Kiln, Allie Brick Kiln, Bashir Ahmad Magray, Sunflower Brick Kiln, Jalal Brick Kiln, Magray Brick Kiln, Thoker Brick Kiln (A-No) and Shahoorа Brick Kiln (ATM). Another three units have been marked “Refused” in the consent status. These are Mir Brick Kiln at Hastikhud Zadoora Newa, Gulmour Brick Kiln at Tumchinowpora and Dar Brick Kiln at Tumchinowpora. The status as per the news agency Kashmir News Trust also contains brick kilns holding valid CTOs, indicating that the regulatory violations are not uniform across the district. The findings assume significance in view of the Jammu & Kashmir Pollution Control Committee's direction to the Deputy Commissioner, Pulwama, to initiate action against brick kilns operating without the requisite permissions and in violation of environmental regulations. The presence of multiple units with expired or refused consent, besides those listed without consent altogether, raises serious questions over their continued operation and the effectiveness of regulatory enforcement in the district. The concerned authorities are now expected to verify the operational status of these units and take action against those found functioning without valid statutory consent. [KNT]](https://newsagencyknt.com/wp-content/uploads/2026/06/Brick-Kiln-390x220.jpg)


